Wells portfolio

Barrier integrity status across all monitored wells

Barrier classification legend
Critical
Barrier Failure, other barrier is compromised, not verified and/or leak to surface
1B Contained
Barrier Failure, other barrier containing well
Degraded
One barrier degraded/compromised
Healthy
No or minor issues, Well barriers "healthy"
Total Wells Monitored
6
Critical / Contained Wells
2
Degraded / Compromised
2
Healthy Wells
2
# of Wells Overdue for Update
2
# of Wells To Be Updated This Month
4
WellVisual LeaksAnnulus StatusCorrosion ProfileMissing ComponentWell Integrity Testing StatusOverall Barrier StatusMitigation StatusLast UpdatedUpdate Status
TD 001None ObservedAll Annuli NormalNoneNone ObservedAll SCE Tested on Time / Okay
Healthy
None Required2026-06-25
Okay
TD 002Wellhead SystemSCP Within MAWOP A-AnnulusMildNone ObservedFailed Tree Valves
1B Contained
Planning Stages2026-06-25
Overdue
TD 003None ObservedSCP Within MAWOP A-AnnulusMediumNone ObservedAll SCE Tested on Time / Okay
Degraded
Implementation in 3 to 6 Months2026-06-25
Okay
TD 004None ObservedAll Annuli NormalMildNone ObservedFailed SCSSV
Degraded
Deferred2026-05-25
Overdue
TD 005Conductor to Starterhead SystemSCP Within MAWOP A-AnnulusSevereNone ObservedAll SCE Tested on Time / Okay
Critical
Implementation in 0 to 3 Months2026-06-25
Okay
TD 006None ObservedAll Annuli NormalNoneNone ObservedAll SCE Tested on Time / Okay
Healthy
None Required2026-06-25
Okay