KPI & Analytics

Reporting period: Jun – Aug 2026 · 6 wells monitored

Wells with issues (Aug 2026)
4 of 6
Critical wells
1
↑ Increased from 0
Overall trend
→ Stable
Entries this period
18

Monthly Barrier Status — KPI (Current Month: Aug 2026)

Barrier StatusWell Count% of TotalCompany TargetAssessmentvs Last Month
Critical
00%05%
PASS ✓
Decreased by 1
1B Contained
117%010%
FAIL ✗
No change
Degraded
350%035%
FAIL ✗
Increased by 1
Healthy
233%50100%
FAIL ✗
No change

Recommended actions

  • 1
    TD 005Severe corrosion & visual leak
    Immediate

    Conductor to starterhead system leak observed. Severe corrosion on tree and wellhead. Secondary barrier integrity at risk.

  • 2
    TD 002, TD 003, TD 005Sustained casing pressure
    Weekly monitoring

    SCP present on A-Annulus across three wells. Continue pressure monitoring and document trend.

  • 3
    TD 002, TD 003, TD 004Corrosion present
    30 days

    Mild to medium corrosion reported. Schedule corrosion assessment within 30 days.

  • 4
    TD 004Barrier failure, deferred mitigation
    Per schedule

    Mitigation status deferred. Confirm schedule and ensure secondary barrier is containing.

  • 5
    TD 003, TD 004Degraded barrier, enhanced monitoring
    Ongoing

    Both wells showing degraded barrier classification for 3+ months. Enhanced monitoring regime recommended.

Lessons Learned — Mitigation Tracking

WellDate of FailureFailure IdentifiedWSA Report GeneratedRemedial ActionMitigation Implemented on Time
TD 0022026-03-10Tree valve leak at wellhead2026-04-01Replace tree valve seals
Yes
TD 0052026-01-15Severe corrosion — conductor to starterhead2026-02-08Corrosion inhibitor injection + conductor repair
No
TD 0042026-02-20SCSSV failure on integrity test2026-03-05SCSSV replacement scheduled
No

This table tracks mitigation completion and WSA usage as a lessons learned repository.