KPI & Analytics
Reporting period: Jun – Aug 2026 · 6 wells monitored
Wells with issues (Aug 2026)
4 of 6
Critical wells
1
↑ Increased from 0
Overall trend
→ Stable
Entries this period
18
Monthly Barrier Status — KPI (Current Month: Aug 2026)
| Barrier Status | Well Count | % of Total | Company Target | Assessment | vs Last Month |
|---|---|---|---|---|---|
Critical | 0 | 0% | 0–5% | PASS ✓ | ↓ Decreased by 1 |
1B Contained | 1 | 17% | 0–10% | FAIL ✗ | → No change |
Degraded | 3 | 50% | 0–35% | FAIL ✗ | ↑ Increased by 1 |
Healthy | 2 | 33% | 50–100% | FAIL ✗ | → No change |
Recommended actions
- 1TD 005 — Severe corrosion & visual leakImmediate
Conductor to starterhead system leak observed. Severe corrosion on tree and wellhead. Secondary barrier integrity at risk.
- 2TD 002, TD 003, TD 005 — Sustained casing pressureWeekly monitoring
SCP present on A-Annulus across three wells. Continue pressure monitoring and document trend.
- 3TD 002, TD 003, TD 004 — Corrosion present30 days
Mild to medium corrosion reported. Schedule corrosion assessment within 30 days.
- 4TD 004 — Barrier failure, deferred mitigationPer schedule
Mitigation status deferred. Confirm schedule and ensure secondary barrier is containing.
- 5TD 003, TD 004 — Degraded barrier, enhanced monitoringOngoing
Both wells showing degraded barrier classification for 3+ months. Enhanced monitoring regime recommended.
Lessons Learned — Mitigation Tracking
| Well | Date of Failure | Failure Identified | WSA Report Generated | Remedial Action | Mitigation Implemented on Time |
|---|---|---|---|---|---|
| TD 002 | 2026-03-10 | Tree valve leak at wellhead | 2026-04-01 | Replace tree valve seals | Yes |
| TD 005 | 2026-01-15 | Severe corrosion — conductor to starterhead | 2026-02-08 | Corrosion inhibitor injection + conductor repair | No |
| TD 004 | 2026-02-20 | SCSSV failure on integrity test | 2026-03-05 | SCSSV replacement scheduled | No |
This table tracks mitigation completion and WSA usage as a lessons learned repository.