TD 005
Critical
Brighton · Producer · Monthly monitoring
Field
Brighton
Well type
Producer
Location
Central
Monitoring frequency
Monthly
Next due
2026-07-25
Timeline
Entry
2026-08-25· R. MohammedCritical
· Conductor to Starterhead System · Severe corrosionEntry
2026-07-25· S. SinghCritical
· Conductor to Starterhead System · Severe corrosionNote
2026-07-10· S. SinghLeak rate appears stable but corrosion worsening. Escalated to senior engineer for review.
Note
2026-06-28· R. MohammedIntervention contractor contacted. Awaiting availability window.
Entry
2026-06-25· R. MohammedCritical
· Conductor to Starterhead System · Severe corrosionReport
2026-05-20Well Integrity Assessment — TD 005View report
Report
2026-02-08Well Integrity Assessment — TD 005View report
Barrier classification history
Last entry summary · 2026-08-25
Visual leaks
Conductor to Starterhead System
Annulus status
SCP Within MAWOP A-Annulus
Corrosion
Severe
Missing components
None Observed
Tree Body & Valve SystemPass
Packoff Seal SystemPass
Wellhead Valve SystemPass
SCSSVPass
SCSSV Control LinePass
Packer SystemPass
Tubing SystemPass
Casing SystemPass